ACC Dairies

Gateshead

 

 
 
Case Study Triple Lay Over

Appointed Celsius as designers, design & build contractor, principal contractor and CDMC

 

The objectives
To centralise numerous small and out-of-date satellite distribution depots into a single purpose-built facility.

The challenges
An existing former transport warehouse required extensive adaptation and re-design.

 

The result

  • Chilled storage and individual secure chilled storage cages provided
  • Scissor lift installation for goods in
  • External refurbishment works designed and completed
  • Drainage systems installed
  • M&E installation carried out
  • New-build plant room designed and completed