Appointed Celsius as designers, design & build contractor, principal contractor and CDMC

 
The objectives
To provide dedicated loading facilities for all possible vehicle types. Proposals for a phased expansion of facilities to greatly increase throughput and efficiency were also required.
 
The challenges
It was necessary to maintain access to existing facilities at all times during the works.
 
 

The result
  • New loading docks designed and installed for multiple vehicle types
  • Refrigerated loading bay constructed
  • Dry goods warehouse created
  • Cooking facilities installed
  • Refrigerated storage provided
  • All process and personnel flows re-assessed
  • New access routes and hygiene facilities created