The result
The project, which included numerous innovative design features, was delivered on time and on budget with zero disruption to production. Design features included:
- 450 Kw refrigeration system with remote air handling units and ducted sock distribution
- New services infrastructure including HV, LV, steam, water services, refrigeration, air, and specialist gasses
- Sprinkler installation to entire site
- Daylight harvesting