Tyneside Foods

Newcastle

 

 

 
 
Case Study Triple Lay Over

Appointed Celsius as designer, design & build contractor, principal contractor and CDMC

 
The objectives
To design and construct a second extension to provide a further 600m2 dry goods storage facility. This followed successful completion of a previous project completed by Celsius comprising a new dry goods extension and dedicated loading facility suitable for use by all possible vehicle types.
 
The challenges
The existing congested site coupled with difficult ground conditions presented a number of challenges to be overcome.
 

The result

An innovative and high quality architectural solution was created to allow the construction of a much improved facility, including:
  • Large recess to allow level loading and unloading
  • Refrigerated loading bays
  • Chilled storage
  • Dry goods storage
  • Cold store extension